ProTool Plate RODI and Delivery for Mounting to an IBC - Window Man - Instructions, Parts list Item # : 890-0991
Spare parts for ProTool Plate RODI and Delivery for Mounting to an IBC - Window Man - Instructions, Parts list
ProTool Plate RODI and Delivery for Mounting to an IBC - Window Man - Instructions, Parts list
BUILD ProTool Electric Plate Mount to IBC
Follow this link to the Product Detail page for your system
https://www.jracenstein.com/schematic/build-protool-electric-plate-mount-to-ibc-window-man/890-0991
Then on the resulting page of images and videos find the "Documents" Button
The instructions are available in word and PDF formats
Note:
We included 50 ft of 3/8in hose line and the appropriate stem barb fittings, Oetiker clamps and a tool and cutter set to allow you to plumb and connect the reels to the Operator Panel
There is als several baggies of spare parts to hopefully handle the little things that may get broken along your journey
This is the first Video and covers how to mount the Plates to the IBC
How we recommend that you go about attaching the plates to your IBC
Overview of Operator Plate panel
Overview of tds connections on Operator Panel to run the hose to the 4 Reels
Overview of Delivery Pumps and Operator Plate panel, connect reel hose from tds probe to Reels
Some of the items will need to be installed once you have all of the panels attached to the IBC
This is the first Video and covers how to mount the Plates to the IBC
RO Membrane Plate to Delivery Pump
RORO Bypass hoses from RO to place the RO Flush Valves
RORO Bypass hoses from RO to place the RO Flush Valves
RORO Bypass hoses from RO to place the RO Flush Valves
RO Pumping Plate explanation and wire paths
RO Pumping Plate low am sensor tank full wire
e
RO Plate Water Inlet, RO Pumped lines 1, 2, 3 Battery Wire connection
e
What needs to be installed on the top of your tank
e
Reference for Testing the RO Membranes with a hand held tank
e
Tutorial on how to remove an Oetiker Clamp from the hose
e